Traffic Management Plan Services in the City of Hume
Planning a project, event, or construction site in Hume? Barleys delivers reliable traffic management solutions that meet council, VicRoads, and Austroads standards—fast.
Why Choose Barleys for Your Traffic Management Plan (TMP)?

Full-Service Documentation
We develop traffic management plans and visual TGS layouts tailored to your job requirements.

Approvals
Our team understands Hume City Council procedures which accelerates the permit process.

Customised for Safety & Scope
Every plan is shaped around road classification, timeframes, risk factors, and community impact.

Event & Construction Expertise
We provide TMPs for all types of jobs—from infrastructure upgrades to festivals and short-term road closures.

Pedestrian Safety Included
Each pedestrian management plan we design focuses on safe pathways, crossing points, and crowd control measures.
What’s Included in Our Planning Services
Traffic Management Plans (TMPs)
Comprehensive documents outlining setup, staging, road closures, detours, and safety measures.
Traffic Guidance Schemes (TGS)
Visual layouts that map Traffic Control Devices (TCD’s) such as temporary signage, barrier placement, and variable message signs (VMS)
Pedestrian Plans
Designed for works near footpaths, schools, shopping strips, and crowded pedestrian zones.
Construction Traffic Impact Assessments
For large developments and roadworks requiring in-depth impact studies, construction vehicle access and route analysis.
Permit Submission & Liaison
We submit to the Department of Transport and Planning (DTP) on your behalf and handle all revision feedback.
Who Needs a Traffic or Pedestrian Management Plan?
Builders & Developers
Ensure compliance and protection for your workforce on busy roads or active urban zones.
Civil Contractors
Maintain compliance while improving workflow with structured detours and staging logic.
Event Planners
Use a certified plan to handle crowds at festivals, parades, and community events.
Utility & Telco Crews
Get your traffic plan approved fast and keep workers safe on roadside assets.
Logistics Managers
Coordinate haul routes, laydown zones, and signage to manage on-site vehicle movement.Public Sector Projects
Meet council requirements for road upgrades, footpath repairs, and community infrastructure work.
Why Hume Clients Rely on Barleys
- Knowledge of Hume’s road types and risk points
- Proven success across urban and suburban works
- Culturally grounded, Aboriginal-owned planning team
- In-house crews available for plan execution
Compliance & Safety Commitment
Each traffic management plan we produce aligns with current legislation, Austroads Guide to Temporary Traffic Management – Part 2 Planning, and AS/NZS safety standards. Our planning prioritises, motorist, pedestrian and workforce safety through proper signage, staging, and separation.
Our Planning Process
Consultation & Site Review
We analyse your site layout, road class, timeframe, and activity level to determine TMP needs.
Plan Creation
We design your traffic management plan, pedestrian management plan, TGS, or swept path diagram as needed.
Council Submission
Our team lodges plans with DTP for works within Hume City Council and responds to any required revisions.
On-Site Execution
Our team of traffic management implementers and traffic controllers can install signage, barriers, and detours to activate your approved plan.
Active Site Audit Reports
Audits completed following implementation ensure compliance. Reports including photos are available to support post-project reporting.
Where Our Plans Are Applied
Urban arterial routes – Pascoe Vale Road, Somerton Road
Suburban collector roads
– Barry Road, Dallas Drive
Retail zones – Near Broadmeadows Central and Craigieburn Plaza
Public event sites – Showgrounds, town squares, and council parks
School zones – Controlled crossings and footpath protection during active works
Let Barleys Plan Your Next Project
Get in Touch
Numbers
Business Address
- Northern Depot; 19/9 Dawson Street, Coburg North, VIC, 3058
- South Eastern Depot; 1/95 Tooradin-Station Road, Tooradin, VIC, 3980
Request a TMP or TGS
Frequently Asked Questions
1. What is a traffic management plan used for?
2. Do I need a pedestrian management plan for footpath works?
3. How long does it take to get a TMP approved in Hume?
Complex TMP’s are produced in 3–5 business days, depending on scope of works and document accuracy.